18 Dec 07 - Final Drilled Rudder Components - 1.5 Hour
I clamped on the rudder bottom attach strips and
then drilled them per the plans.

Rudder Bottom Attach Strips
Once the bottom of the rudder is drilled,
all of the other rudder-to-understructure holes are final drilled to #40.
Rudder after drilling.

All rudder components disassembled and ready for edge finishing and deburring.
<< PREVIOUS | INDEX | NEXT >>